Background

Installation of deep storm drains formed a major part of the Al Ain Municipality (AAM) project to upgrade roads and infrastructure in these areas.

Site report
Illustration
No items found.
Conservation

Installation of deep storm drains formed a major part of the Al Ain Municipality (AAM) project to upgrade roads and infrastructure in these areas.

Background

Installation of deep storm drains formed a major part of the Al Ain Municipality (AAM) project to upgrade roads and infrastructure in these areas.

Latitude:

24.2752

Longitude

55.7695

Coordinated System:

Surveyed By:

HBL photogrammetry and Geotech 3D laser and UAV scan

Surveyed On:

Contractor:

Al Kharafi 

Neighbourhood:

Falaj Al Mazmi

Street Name:

Road 11

Plot Number:

Owner

AAM

Site Type

part of ghayl falaj or ‘underground water-draining gallery’

Start of works

April 2020

End of works

April 2020

Learn how we reference architectural elements in sites.

See terminology
Period

Iron Age 1300-300 BCE

FAM20 Road11