Background

Installationof deep storm drains formed a major part of the Al Ain Municipality (AAM)project to upgrade roads and infrastructure in old shabiyaat areas.

Site report
Conservation

The extended trench was covered with a layer of protective geotextile to provide warning of its presence during the course of any future excavation in this area

Background

Installationof deep storm drains formed a major part of the Al Ain Municipality (AAM)project to upgrade roads and infrastructure in old shabiyaat areas.

Latitude:

24.275404

Longitude

55.771565

Coordinate System:

WGS84 / UTM zone 40N

Surveyed By:

HBL

Surveyed On:

Contractor:

Al Kharafi

Consultant:

Neighbourhood:

Falaj Al Mazmi

Street Name:

Road 1 "Ath Thaqafat Street"

Plot Number:

Owner

Al Ain Municipality

Site Type

part of ghayl falaj

Start of works

09/05/2020

End of works

28/05/2020

Learn how we reference architectural elements in sites.

See terminology
Period

Iron Age 1300-300 BCE

FAM20 Road 1

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Book a visit
No items found.