الخلفية

The Al Ain Municipality Old shaabiyas project which began in 2019 is concerned with upgrading of roads and infrastructure, in particular the installation of a new (and deep) stormwater drainage system via a network of 1m wide and up to 4m deep trenches running through the street grid of the shabiyaat. These are government housing projects initiated from the late 1960s onwards.  Some of them lie in or adjacent to the various World Heritage Site buffer zones and many are close to the oases and the historic earthen villages which they effectively replaced. To date we have monitored and documented a total length of more than 5km of these stormwater trenches.

تقرير الموقع
رسم توضيحي
لم يتم العثور على أية عناصر.
الحفظ

The Al Ain Municipality Old shaabiyas project which began in 2019 is concerned with upgrading of roads and infrastructure, in particular the installation of a new (and deep) stormwater drainage system via a network of 1m wide and up to 4m deep trenches running through the street grid of the shabiyaat. These are government housing projects initiated from the late 1960s onwards.  Some of them lie in or adjacent to the various World Heritage Site buffer zones and many are close to the oases and the historic earthen villages which they effectively replaced. To date we have monitored and documented a total length of more than 5km of these stormwater trenches.

الخلفية

The Al Ain Municipality Old shaabiyas project which began in 2019 is concerned with upgrading of roads and infrastructure, in particular the installation of a new (and deep) stormwater drainage system via a network of 1m wide and up to 4m deep trenches running through the street grid of the shabiyaat. These are government housing projects initiated from the late 1960s onwards.  Some of them lie in or adjacent to the various World Heritage Site buffer zones and many are close to the oases and the historic earthen villages which they effectively replaced. To date we have monitored and documented a total length of more than 5km of these stormwater trenches.

خط العرض:

24.294503

خط الطول

55.777202

نظام منسق:

WGS84 / UTM zone 40N

تم مسحها بواسطة:

تم إجراء الاستطلاع على:

المقاول:

الجوار:

Hili Misbah

اسم الشارع:

Road 15, Road 16

رقم قطعة الأرض:

مالك

Al Ain Municipality Old shaabiyas project

نوع الموقع

بداية الأعمال

نهاية الأعمال

تعرف على كيفية الإشارة إلى العناصر المعمارية في المواقع.

راجع المصطلحات
الفترة

IA/PIR? and EI

MSB Road 15\16

Lorem Ipsum هو مجرد نص وهمي لصناعة الطباعة والتنضيد. كان لوريم إيبسوم هو النص الوهمي القياسي في الصناعة منذ القرن الخامس عشر الميلادي، عندما أخذت طابعة غير معروفة مطبخًا من النوع وهرشته لصنع كتاب نموذجي.

احجز زيارة
No items found.