Background

Installationof deep storm drains formed a major part of the Al Ain Municipality (AAM)project to upgrade roads and infrastructure in old shabiyaat areas.

Site report
Illustration
No items found.
Conservation

no specific measures were implemented as a pipe was installed in the sewer line trench and then backfilled with clean sand

Background

Installationof deep storm drains formed a major part of the Al Ain Municipality (AAM)project to upgrade roads and infrastructure in old shabiyaat areas.

Illustration
No items found.
Latitude:

24.275337

Longitude

55.770482

Coordinate System:

WGS84 / UTM zone 40N

Surveyed By:

HBL

Surveyed On:

Contractor:

Consultant:

Neighbourhood:

Falaj Al Mazmi

Street Name:

Road 6 "Umm Ad Diliy Street"

Plot Number:

Owner

Al Ain Distribution Company

Site Type

part of ghayl falaj

Start of works

September/October 2021

End of works

Learn how we reference architectural elements in sites.

See terminology
Period

Iron Age 1300-300 BCE

FAM21 Road 6

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Book a visit
No items found.