Background

demolition ahead of new house construction

Site report
Illustration
No items found.
Conservation

A MH survey was carried out by the owner before demolition. Falaj salafa slabs recovered in excavation were replaced in shafts which were then backfilled with red sand and geotextile. The route of the falaj was covered by a concrete slab and the foundations located to have no impact on the falaj

Background

demolition ahead of new house construction

Illustration
No items found.
Latitude:

24.275430

Longitude

55.771862

Coordinate System:

WGS84 / UTM zone 40N

Surveyed By:

HBL & GeoTech

Surveyed On:

Contractor:

Consultant:

Neighbourhood:

Street Name:

Plot Number:

Owner

Site Type

Start of works

11/09/2022

End of works

12/10/2022

Learn how we reference architectural elements in sites.

See terminology
Period

FAM22 Road 01

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Book a visit
No items found.